Our Experience

  • Pipeline Integrity Assessment and Life Extension Study for 6 Nos. Pipelines
    Bunduq Company Ltd
    United Arab Emirates UAE
    2014 - 4 Months
  • Dynamic stress analysis as a part of FFS & Life Extension Study for Bunduq static equipment and piping system
    Bunduq
    United Arab Emirates UAE
    2014
  • Static & Dynamic Stress analysis for gas compressor lube oil header to assess Vibration fatigue (by using CAESAR II Software).
    Oil and Gas Development Company Limited - OGDCL
    Pakistan
    2014
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD
    Binh SON Refining & Petrochemical CO. LTD (BSR)
    Vietnam
    2014
  • Dynamic stress analysis as a part of FFS & Life Extension Study for Bunduq static equipment and piping system
    Bunduq
    United Arab Emirates UAE
    2014
  • Static & Dynamic Stress analysis for gas compressor lube oil header to assess Vibration fatigue (by using CAESAR II Software).
    Oil and Gas Development Company Limited - OGDCL
    Pakistan
    2014
  • Order Number: 3620015913 MOB OF RAM ENGR & RAM CONSLTCY (BETTY) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Order Number: 3610078194 MOB OF RAM ENGINEER & RAM CONS.(TEMANA) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Order Number: 3620015973 MOB OF RAM ENGR & RAM CONSLTCY (BAKAU) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Order Number: 3610078194 MOB OF RAM ENGINEER & RAM CONS.(D18) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Order Number: 3610078194 MOB OF RAM ENGINEER & RAM CONS.(BAYAN) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • “Order Number: 3620025175 MOB of RAM Engineer & RAM CONS. FR RAM (MCOT) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations”
    Petronas Carigali
    Malaysia
    2014
  • Order Number: 3620072512 PO CTRs OFFSHORE VISIT – TE, D18,BY,BK as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Provision of Consultancy for field Reliability, Availability, Maintainability (RAM) Model development using MAROS for Petronas Carigali Sdn Bhd – Sarawak operations
    Petronas Carigali
    Malaysia
    2014
  • Provision of Consultancy for field Reliability, Availability, Maintainability (RAM) Model development using MAROS for Petronas Carigali Sdn Bhd – Sarawak operations
    Petronas Carigali
    Malaysia
    2014
  • PWA/GTC/004/11-12 – Consultancy Services For Survey Services For Pavement Condition And Right Of Way Asset Inventory Data Collection Including Provision Of Necessary Software Solutions, Training And Post Implementation Support Services EBSD /10-11/N/003/G
    ASHGHAL
    Qatar
    2014
  • Validation of Structural Suitability of Ground Floor Slab in GUP Substation to Accommodate Additional Equipment Racks
    Abu Dhabi Oil Refining Company (TAKREER)
    Abu Dhabi, UAE
    2014
  • Design Verification of Q1, Q2 & Q3 Sea Water Chamber Roof
    Qatar Fertilizer Company (QAFCO)
    Qatar
    2014
  • Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
    MISC Offshore Floating Terminals (L) Limited
    Malaysia
    2014
  • Development & Implementation of Integrated Maintenance & Reliability System
    MURPHY
    Malaysia
    2014