Our Experience

  • Marine Water Sampling and Analysis and preparation of report as per EAD.
    National Marine Dredging Company (NMDC)
    Abu Dhabi, UAE
    2021
  • Consultancy Services for Operation Health, Safety & Environmental Impact Assessment (HSEIA) Study for Aviation Fuel Depot Fujairah
    ADNOC Distribution
    United Arab Emirates UAE
    2021
  • Environmental Monitoring
    ALGAZAL TRANSPORT
    Abu Dhabi, UAE
    2021
  • Construction Environmental Management Plan (CEMP) CEMP Audit
    NUROL LLC
    Abu Dhabi, UAE
    2021
  • Contract No. 11440 HSE Audit at Onshore and Offshore Rigs (Variation Order No. 2)
    National Drilling Company (NDC)
    United Arab Emirates UAE
    2021
  • Consultancy Services for Operation Health, Safety & Environmental Impact Assessment (HSEIA) Study for Aviation Fuel Depot RAK
    ADNOC Distribution
    United Arab Emirates UAE
    2021
  • Environmental Monitoring
    AL SHOUMOUKH INDUSTRIES
    Abu Dhabi, UAE
    2021
  • BeAAT Expansion Project – Project No. 5649 Phase 2 & 3 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2020
  • Provision of Third Party Approval of detailed design package and Pre-Commissioning package of NG/ SNG Installation Pipe work.
    Altorath International Engineering Consultants LLC
    Abu Dhabi, UAE
    2020
  • Environmental Monitoring & Testing OF Etihad Rail Stage 2&3 Project C0304-Package 2 B
    GHANTOOT TRANSPORT & GENERAL CONTRACTING LLC
    Abu Dhabi, UAE
    2020
  • Project No: VELPO-0114-2020 Provision of Third Party Design Review of 54 Liter LPG Cylinder As Per ISO 22991 And ADNOC Guidelines.
    Velosi Oman
    Oman
    2020
  • Safety Case for Onshore Facility
    Dragon Oil Turkmenistan Limited (DOTL)
    United Arab Emirates UAE
    2020
  • Ambient Air Quality Monitoring
    PROGRYND INDUSTRIES
    Abu Dhabi, UAE
    2020
  • Environmental Baseline Assessment as per below
    Total Abu Al Bukhoosh
    Abu Dhabi, UAE
    2020
  • Construction Environmental Management Plan (CEMP)
    TASNEEM GENRAL CONTRACTING CO. & REAL ESTATE MANAGEMENT L.L.C
    Abu Dhabi, UAE
    2020
  • Construction Environmental Management Plan for Asset Enhancement Scheme – Construction of Deep Gravity Lines to Link Samha and Shahama Areas with Lines Near Ps 7/2-Area 1 Part 3
    MACE Contractor
    United Kingdom
    2020
  • Environmental Monitoring & Testing Of Hotel Premises
    THE RITZ CARLTON HOTEL ABU DHABI
    Abu Dhabi, UAE
    2020
  • Project No: 570-604129 Provision of Third Party Design Review Services For Pre-Engineered Building Workshop At Fujairah For Structural Integrity Verification
    VTTI Fujairah Terminals Ltd Fzc
    United Arab Emirates UAE
    2020
  • “Update Operating Manuals & Procedures (OP & MS) for ADCO Fields, Terminals & Pipelines-Full Implementation Across ADCO Assets (Phase II) for ASAB & SAHIL Contract No. 16079.01 “
    ADCO
    United Arab Emirates UAE
    2020
  • RBI Implementation Project with Provision of Software and Associated Services
    Groupement Berkine SH/AAC
    Algeria
    2020
  • Environmental Impact Assessment for a new Recycling Building in JAFZA
    GREEN SOLUTIONS
    Pakistan
    2020