Our Experience

  • Structural Integrity Assessment & Life Extension Study for EB-37
    Bunduq Company Ltd
    United Arab Emirates UAE
    2015
  • Third party QSHE (Quality, Safety, Health & Environment) & House Keeping Audit at 09 PARCO & PARCO Stations and Terminal
    Pak-Arab Refinery Limited (PARCO)
    Pakistan
    2015
  • Third Party Services for Drops Survey of Onshore Rigs 2015 Call Out Basis KCA Deutag Drilling G.M.B.H Islamabad
    KCA Deutag Drilling G.M.B.H Islamabad
    Pakistan
    2015
  • SIL Study for All Operating Units at QP Refinery , Mesa
    Qatar Petroleum
    Qatar
    2015
  • Basic Engineering Study for Fire Risk Assessment Implementation (Phase-1)
    ADOC Abu Dhabi Oil Co. Ltd. (Japan)
    United Arab Emirates UAE
    2015
  • “Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Buildings. “
    HEBERGER ENGINEERING
    Abu Dhabi, UAE
    2015
  • Project No: 12423 Design Review and Approval of Lifting Frame & Lifting Beam (01. No)
    Velath Engineering International FZC
    United Arab Emirates UAE
    2015
  • Provision of complete design package for MSV Skid including piping stress analysis.
    VANGUARD ENGINEERING & OIL FIELD
    Abu Dhabi
    2015
  • Consultancy Services for Updating Operating Manual for Abu Dhabi Refinery
    TAKREER
    United Arab Emirates UAE
    2015
  • Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines for Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Malaysia
    2015
  • Fire and Gas Equipment Audit Of Mol Production Facilities
    MOL Pakistan Oil & Gas Co. B.V.
    Pakistan
    2015
  • PWA/GTC/004/11-12 – Consultancy Services For Survey Services For Pavement Condition And Right Of Way Asset Inventory Data Collection Including Provision Of Necessary Software Solutions, Training And Post Implementation Support Services EBSD /10-11/N/003/G
    ASHGHAL
    Qatar
    2014
  • KPOC CTR 001B Pipeline RBI Study-Gas
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Order Number: 3620072512 PO CTRs OFFSHORE VISIT – TE, D18,BY,BK as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
    MISC Offshore Floating Terminals (L) Limited
    Malaysia
    2014
  • Third Party Approval of detailed design package and of NG Installation Pipe work.
    Al Fanar
    Saudi Arabia
    2014
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh SON Refining & Petrochemical CO. LTD (BSR
    Vietnam
    2014
  • Project No: LUS-O&M0921 Design Calculation for Cassette Arrangement (Top Frame).
    Degermont SA Qatar
    Qatar
    2014
  • Tank Terminal (Including Integrity & HSE (Health Safety and Environment) Studies)
    Oil and Gas Regularity Authority (OGRA)
    Pakistan
    2014
  • Validation of Structural Suitability of Ground Floor Slab in GUP Substation to Accommodate Additional Equipment Racks
    Abu Dhabi Oil Refining Company (TAKREER)
    Abu Dhabi, UAE
    2014
  • Integrity Study of Bushra Line 33km for DALEEL
    Daleel Petroleum L.L.C.
    Oman
    2014