Velosi Worldwide

Global Reach & Local Services

We operate globally through our associate offices in
Africa, Asia, Europe and Middle East.

  Associate Offices Worldwide
  • Algeria
  • Angola
  • Bahrain
  • Brunei
  • China
  • UAE
  • Egypt
  • Ghana
  • Indonesia
  • Japan
  • Kuwait
  • Malaysia
  • Mongolia
  • Oman
  • Philippines
  • Pakistan
  • Qatar
  • Saudi Arabia
  • South Africa
  • South Korea
  • Thailand
  • Turkey
  • Vietnam
Request for information

Survey, Design & Supervision of Fire Fighting Systems for 47 Nos. State Life Buildings all Over Pakistan


Location:
Karachi, Pakistan
Client:
STATE LIFE OF PAKISTAN
Region:
South-Asia
Services:
Survey Detail Engineering Resident Supervision
OBJECTIVE

The purpose of this assessment is to ensure the following

  • Physical survey of fire- fighting systems installed at state Life Buildings.
  • Technical assessment regarding the present condition of fire- fighting components, i.e. pumps, risers, fire extinguishers, fire hose cabinets, fire hydrants etc.
  • Determine remaining useful life of the fire-fighting system
  • Ascertain availability of spares for the models of fire-fighting components etc.
  • Submission of technical study report to SLIC for approval with recommendations for rehabilitation/replacement of fire- fighting system and budgetary costs for various options.
  • Phasing and time schedule of assignment.
  • Policy decision for disposal of existing fire- fighting system (if applicable).
SCOPE OF WORK

The scope of services is divided into four stages to be conducted iteratively and interactively, namely:

  • Stage 01- Technical Study:
  • Stage 02- Preparation of Tender Documents:
  • Stage 03- Supervision during Installation of firefighting System:
  • Stage 04- Preparation of operation and maintenance (O&M) contract and monitoring of OPM works.
Deliverables
  • Survey & Technical Study Report
  • Preparation of Tender Documents
  • B.O.Q
  • Specifications
  • General and Special conditions of contract
  • Drawings & cost estimates
  • Pre/Post Calcifications response Invitation of Bids
  • Evaluation of Bids and recommendation for award of work
  • Schedule of rehabilitation/ replacement works
  • Monthly progress report
  • Testing and commissioning Reports
  • training program Report
  • Preparation of operation and maintenance (O&M) contract
x
We use tools, such as cookies, to enable essential services and functionality on our site and to collect data on how visitors interact with our site, products and services. Got it
ISO 90001 ISO 14000 ISO 27000 ISO 45000 ISO 55000

Subscribe for email alerts

* indicates required

© Copyright 2021 Velosi Integrity & Safety Pakistan (PVT) Ltd.