Velosi Worldwide

Global Reach & Local Services

We operate globally through our associate offices in
Africa, Asia, Europe and Middle East.

  Associate Offices Worldwide
  • Algeria
  • Angola
  • Bahrain
  • Brunei
  • China
  • UAE
  • Egypt
  • Ghana
  • Indonesia
  • Japan
  • Kuwait
  • Malaysia
  • Mongolia
  • Oman
  • Philippines
  • Pakistan
  • Qatar
  • Saudi Arabia
  • South Africa
  • South Korea
  • Thailand
  • Turkey
  • Vietnam
Request for information

HSE & Fire Quantitative Risk Assessment Studies for Dukhan Fields


Location:
Dukhan, QP Qatar
Client:
Qatar Petroleum
Region:
Middle-East
Services:
Quantitative Risk Assessment (QRA)
Objective

The objective of the CONTRACT is to provide a technical survey and HSEF QRA study for the Facilities. The technical survey shall enable QP to be aware of the current risk status (non conformities) in the Facilities by department and asset.

The findings of the technical survey shall be carried forward into the HSEF QRA study which outcome shall be risk-based recommendations for risk reduction (closing of gaps to ALARP) where necessary with clear, feasible and prioritized recommendations consisting in potential corrective measures/actions and improvements for risk reduction to ensure safe operations.

Scope of Work

Phase I:
To conduct a base line technical survey of the Facilities which findings shall be further used as input to the HSEF QRA study. The survey shall enable QP to be aware of the current risk status and non conformities.

Phase II:
Upon completion of the Phase-1 (Technical Survey) and approval by QP of related deliverables, the next phase shall be the execution of the HSEF QRA study for all Duhan Facilities.

Phase III:
To conduct QRA study for 37 critical pipelines & 73 critical wellheads

Deliverables

Velosi successfully submitted the following deliverables:

  • Technical Survey Reports of all Dukhan Fields (20 facilities)
  • Quantitative Risk Assessment Reports of all Dukhan Fields (20 facilities)
  • Combined Quantitative Risk Assessment Report for all Dukhan Fields (20 facilities) & 37 critical pipelines & 73 wellheads
x
We use tools, such as cookies, to enable essential services and functionality on our site and to collect data on how visitors interact with our site, products and services. Got it
ISO 90001 ISO 14000 ISO 27000 ISO 45000 ISO 55000

Subscribe for email alerts

* indicates required

© Copyright 2021 Velosi Integrity & Safety Pakistan (PVT) Ltd.