Suite No. 1104, Al-Ghaith Tower, Hamdan Bin Mohammed Street, P.O. Box 114192, Abu Dhabi, UAE

Sun-Thu, 8:30-18:00 | Sat, 11:00-16:00 | Fri, Closed

 Latest News
  Take a Survey
Velosi Pakistan

Wellhead Integrity Management System

Wellhead Integrity Management System


Velosi uses FMECA based RBI Methodology for Wellhead Integrity Assessment. The methodology is developed in accordance with BS EN 60812, IEC 60812, OREDA, API 6A, API 14B, API 14C, API RP 57 and ISOTS-116530-2 to optimize the preventive maintenance activities.

In the context of well integrity, Velosi recommends use of reliability analysis methods that can be used to identify and assess the impact of failures of well barrier elements.

Such analysis are useful for:

  • Comparing different well maintenance alternatives with respect to blowout probabilities
  • Evaluating the blowout risk for specifc well equipment
  • Identifying potential barrier problems in specifc well types
  • Assessing the effect of various risk reduction methods
  • Identifying potential barrier problems during well interventions/maintenance activities

Velosi uses FMECA approach to answer the following questions:

  • In what ways can system components fail?
  • What are the underlying causes of failures?
  • How can failures be detected?
  • What are the failure effects, on the failed component and on the system?
  • How critical are the failure effects, in terms of damage to humans, the environment, or material assets?
  • What are the common industrial practices to mitigate the failures against identifed mechanisms?
x
We use tools, such as cookies, to enable essential services and functionality on our site and to collect data on how visitors interact with our site, products and services. Got it

© Copyright 2019 Velosi Asset Integrity Ltd.