Risk Based Inspection (RBI) Study for KNPC’s Clean Fuel Project MAA Package


KNPC-Mina-Al-Ahmadi Refinery
Kuwait
Location:
Kuwait
clientdummies
Client:
JGSK
RegionLogoCS
Region:
Middle East
ServicesLogoCS
Services:
Risk Based Inspection (RBI) Study

Velosi conducted a Risk-Based Inspection (RBI) Study for KNPC Clean Fuel Project MAA Package located in Kuwait in order to assure asset integrity resulting in substantial cost savings and therefore to reduce the risks to Mina-Al-Ahmadi Refinery’s operational objectives.

Objective
  • Conduct a Risk-Based Inspection (RBI) Study in order to assure asset integrity and therefore to reduce the risks to JGSK’s Mina-Al-Ahmadi Refinery’s operational goals.
  • Perform the efective application of RBI principles to reduce unplanned equipment failures and associated plant shutdowns.
Scope of Work:
  • Carry out Shell RBI (Level-3) assessment for 38 New (Process/ Utility) units, and 41 Revamp and Tie-In (Process/ Utility) units, at construction stage and As-Built stage.It also comprised to ensure the usage of Shell RRM software in the linkage of risks with appropriate inspection, process control or other risk mitigation activities.
Deliverables:

Velosi submitted the following deliverables:

  • Risk Based Inspection (RBI) Study:
    • Risk Based Inspection Methodology/Execution Procedure
    • Corrosion Loop Drawings over PFS and PEFS
    • Optimized Inspection Plan
    • Corrosion Risk Assessment Summary Report
    • Risk Management with Inspection Activities
    • Data population in Shell RRM software
    • API 650 Tank Assessment Results from Tank RRM Module.
    • Corrosion Loop Smart Sketch
x
We use tools, such as cookies, to enable essential services and functionality on our site and to collect data on how visitors interact with our site, products and services. Got it
ISO 90001 ISO 14000 ISO 27000 ISO 45000 ISO 55000

Subscribe for email alerts

* indicates required

© Copyright 2021 Velosi Asset Integrity Ltd.