Velosi Worldwide

Global Reach & Local Services

We operate globally through our associate offices in
Africa, Asia, Europe and Middle East.

  Associate Offices Worldwide
  • Algeria
  • Angola
  • Bahrain
  • Brunei
  • China
  • UAE
  • Egypt
  • Ghana
  • Indonesia
  • Japan
  • Kuwait
  • Malaysia
  • Mongolia
  • Oman
  • Philippines
  • Pakistan
  • Qatar
  • Saudi Arabia
  • South Africa
  • South Korea
  • Thailand
  • Turkey
  • Vietnam
Request for information

Waste Heat Recovery Project-Feed Phase HSEIA Study


ADNOC Refining
Ruwais Industrial Complex Abu Dhabi
Location:
Ruwais Industrial Complex Abu Dhabi
clientdummies
Client:
ADNOC Refining
RegionLogoCS
Region:
Middle-East
ServicesLogoCS
Services:
FEED Phase-HSEIA Study

Velosi was appointed by ADNOC Refining to carry out a Health, Safety and Environmental Impact Assessment (HSEIA) study of the FEED Stage for their General Utility Plant (GUP) located at Ruwais Industrial Complex, Abu Dhabi, UAE.

Objective

HSEIA Studies : To perform HSEIA Studies of the FEED Stage as per the requirements of local regulatory authority, and ADNOC Refining’s standards and procedures. to recover waste heat to produce high energy steam (HP) and water for improving energy efficiency and reducing environmental impact.

Scope of Work
  • Addition of one (1) new dual pressure waste heat recovery boiler at GTG-24 exhaust.
  • Replacinglacing existing WHRBs of GTG-25,26 & 27 with three new dual pressure WHRBs
  • Addition of two new steam Turbine generators and MED type Desalination units
Deliverables

Velosi successfully submitted the following deliverables:

  • HAZID/ENVID/OHID Workshops & Reports
  • EIA Scoping and Screening Study Report
  • HSEIA Scoping Study Report
  • HEMP Register
  • OHRA Report
  • QRA Methodology & Assumption Register
  • HSEMS Review Analysis Report
  • PPC Report
  • Air Dispersion Modeling
  • QRA Study Report
  • EIA Report
  • Noise Assessment Study Report
  • ESSA Report
  • F&G Mapping Study
  • EERA Report
  • SIMOPS Workshop Report
  • ALARP Demonstration Report
  • Fire Risk Assessment Study
  • Bow-Tie Assessment Report
  • COMAH Report
  • FEED Phase HSEIA Study Report
x
We use tools, such as cookies, to enable essential services and functionality on our site and to collect data on how visitors interact with our site, products and services. Got it
ISO 90001 ISO 14000 ISO 27000 ISO 45000 ISO 55000

Subscribe for email alerts

* indicates required

© Copyright 2021 Velosi Asset Integrity Ltd.