ADNOC LNG Trains Operational Life Extension Independent Overall Assessment and Verification


ADNOC LNG
Das Island-UAE
Location:
Das Island, UAE
clientdummies
Client:
ADNOC LNG
RegionLogoCS
Region:
Middle-East
ServicesLogoCS
Services:
Remaining Life Assessment (RLA)

Velosi conducted an independent overall integrated review and verification, including a Remaining Life Assessment (RLA), of all the studies and work carried for extending the operating life of ADNOC LNG Train-1, 2 and 3 and the associated facilities located in Das Island, UAE.

Scope

Phase 1:

The scope of work included the overall review of LNG trains operational life extension approach that comprised establishing a road map to conduct the study for all the disciplines, involving integrity, reliability of the rotating/mechanical equipment, electrical and instrument, and control.

Phase 2:

The scope of work included carrying out independent validation, verification, and providing consistency of study outcomes that comprised reviewing the outcomes from the different packages for verifying and validating the conclusions and the recommendations and address, if required, any additional analysis or study to assure the asset integrity and fitness for service.

Process

Velosi has assessed the current condition of the LNG Train-1, 2 and 3 and the associated facilities and also their remaining life. We have adopted a logical approach and our efforts are directed towards gathering data on the component/equipment history.

Outcome

Velosi has successfully implemented a comprehensive Integrity and Reliability Management System (AIRMS) and has carried out additional studies to identify and monitor specific damage mechanisms for various plant areas. To enhance the existing knowledge-base, ADNOC LNG required a further detailed assessment of specific plant areas and systems, particularly to identify measures to extend the lifetime of such systems whilst ensuring required integrity and reliability.

Deliverables:

Velosi submitted the following deliverables:

  • Operational Life Extension Approach Review Report for Phase 1
  • Presentation to ADNOC LNG Management on Operational Life Extension Approach Review for Phase 1
  • Report for Phase 2 including Investment and Implementation Plan
  • Presentation to ADNOC LNG Management on Phase 2
x
We use tools, such as cookies, to enable essential services and functionality on our site and to collect data on how visitors interact with our site, products and services. Got it
ISO 90001 ISO 14000 ISO 27000 ISO 45000 ISO 55000

Subscribe for email alerts

* indicates required

© Copyright 2021 Velosi Asset Integrity Ltd.